Today I decided to get the motorcar trailer ready to receive the Bolens 1250 tractor body we are going to mount on it to serve as a rail-mower. I spent an hour or so penciling in the outline of where on the trailer floor I will need to cut to create access for the tractor body and then another hour and a half drilling and cutting. I ended up with the following:
I still have to enlarge the bottom portion of the cutout to accommodate the mower deck hangers, but otherwise it looks pretty good. I wanted to preserve as much as possible of the floor since we will be placing equipment and tools on it while operating the rail-mower.
Frank Glatzl will be coming over early Saturday morning, the 17th, around 8:00 am, so we can get as much done as possible before it gets really hot. But the forecast is for mid-90s, which is much better than the 100 degree plus temps we have suffered through all summer. I worked on this project up until noon or so, by which time it was hot enough to call it a day.
No comments:
Post a Comment